For example, with a well that has 40 feet of drawdown and is pumping 200 gpm has a Specific Capacity of 5. The maximum pumping rate is calculated as the Specific Capacity times the maximum available drawdown. The maximum pumping rate of a well can be estimated using the initial Specific Capacity. Rehabilitation work should be scheduled when a well’s Specific Capacity drops by 15% or more. Specific Capacity testing should be performed at least semi-annually and water levels (static and pumping) should be collected monthly to provide early detection of potential well problems. As time goes by, the Specific Capacity will decline as plugging of the well’s perforations or filter pack occurs or as static water levels change. The Specific Capacity obtained just after a well is drilled and properly developed is typically the highest value that will be produced and is the baseline for comparison for all future values. Ideally, to provide the best comparison of Specific Capacity measurements over time and a comparison to the original test results, the same continuous pumping time frame should be used for each subsequent test. Typically, a well should run continuously for at least 24 hours at a constant yield before recording the drawdown to allow drawdown to stabilize (Driscoll, 1986). If the well was pumping at 200 gpm, the Specific Capacity would be 200 gpm divided by 40 feet of drawdown to give a Specific Capacity of 5. In the figure at the left, the well has a drawdown of 40 feet. Note: SC = Specific Capacity (gpm/ft) Q = discharge (gpm) s = drawdown (ft) The following equation is used to calculate Specific Capacity: Specific Capacity can also be used to provide the design pumping rate or maximum yield for the well and to estimate the transmissivity of the surrounding formations penetrated by the well screens. The Specific Capacity of a well is the pumping rate (gpm) (Q) divided by the drawdown in feet (s). Because it usually requires very little effort to collect the data necessary for the calculation of Specific Capacity, it is an extremely useful measurement that can be used to identify declines in well performance, which allows for planning an optimal well rehabilitation schedule.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |